x
Send Your Inquiry Today
Quick Quote
2024

Faq About Lugao

General Questions

What types of power distribution equipment does Lugao manufacture?

Lugao specializes in high- and low-voltage power distribution equipment. Its product range includes high- and low-voltage switchgear, vacuum circuit breakers (VCB), ring main units (RMU), gas-insulated switchgear (GIS), air-insulated switchgear (AIS), power and distribution transformers, prefabricated substations, high-voltage disconnectors, and instrument transformers.

Do Lugao Power products comply with international standards?

Yes. All our products are designed, manufactured, and tested in strict accordance with international standards (including IEC, CE, and the ISO 9001 quality management system). Type test reports can be provided upon request.

Does Lugao Power support OEM and ODM customization?

Absolutely. We provide tailor-made engineering solutions, including customized voltage ratings, enclosure IP ratings, dimensions, and component configurations to meet specific local grid or project requirements.

Where is your factory located, and can we arrange a site audit?

Our factory is located at No. 19, Keaisi Road, Xiangyang Industrial Zone, Liushi Town, Yueqing City, China. We warmly welcome customers and third-party inspection agencies to conduct factory audits and pre-shipment inspections.

Sales Questions

How can I request a quote for electrical equipment?

You can submit an inquiry through our Contact Form or email us directly with your project specifications, single-line diagrams (SLD), required voltage levels, and quantity. Our sales team will respond within 24 hours.

What is your typical Minimum Order Quantity (MOQ)?

We offer flexible MOQ settings depending on the product line. For standard circuit breakers or switchgear units, we accept trial orders starting from 1 set to support your project evaluation.

What are your payment terms?

30% payment by T/T in advance, 70% payment before shipment.

What is the lead time for standard vs. customized orders?

Standard products typically ship within 15 to 25 days. Custom switchgear assemblies or large-scale equipment usually require 30 to 45 days, depending on design approval and component procurement.

Can you provide trade terms like FOB, CIF, or DDP?

Yes, depending on your shipping preferences and destination customs clearance requirements, we support common Incoterms, including FOB, CIF, CFR, and DDP.

After-Purchase Questions

What warranty period does Lugao offer?

We provide a standard 12 to 24-month warranty from the date of shipment or commissioning (whichever comes first). Extended warranty options can also be negotiated for specific projects.

How are products packaged for overseas transportation?

The equipment is protected using export-standard packaging, including heavy-duty wooden crates, moisture-proof vacuum packaging, and shock-absorbing cushioning materials.

What should I do if components are damaged during transport?

We do strict quality control before shipment and we are responsible for the FCL. If there is any damage during transportation (it’s really rarely happen), please inform us at once with photo or video, and the replacement parts will be sent as a priority.

Do you offer technical support for installation and maintenance?

Yes. We provide comprehensive technical documentation, wiring diagrams, and video guidance. For substation projects, we can also provide remote engineering support or on-site commissioning guidance.

Getting Started Questions

Can you assist with tender documentation and technical submittals?

Yes. Our engineering team supports your tendering process by providing comprehensive technical data sheets, CAD dimension drawings, type test summaries, and other relevant documentation.

How do we ensure quality before bulk shipment?

All units are subjected to rigorous routine factory testing (FAT) prior to shipment. We have standard Factory Inspection Reports, and customers may do live video inspections or hire their own inspector.

How quickly can I receive engineering drawing approvals after placing an order?

Approval drawings (arrangement and schematic diagrams) are generally completed within 3 to 5 business days of contract confirmation and are submitted for client review.

4.How do I become an authorized distributor for Lugao?

Approval drawings (arrangement and schematic diagrams) are generally completed within 3 to 5 business days of contract confirmation and are submitted for client review.

WeChat
WeChat QR
WhatsApp
WhatsApp QR
Call Now
Email Now
Scroll to Top